| Item | Location |
|---|---|
| Heat Gun | Set 11, Cabinet 1, Shelf 2 |
| Mounted Meter Stick | Behind Large Electrostatic Device |
| Rubber Bands | TLC Desk |
| 1-kg Masses | Mass Station |
| Assorted rods and Clamps |
Set-up Instructions:
1. Use a bench clamp to connect a stand rod to a cart with a wooden top.
2. Connect a cross bar at the top of the rod.
3. Hang a rubber band from the crossbar and attach a mass. Place the mounted meter stick behind the rubber band.
4. Gently pull on the mass to stretch the rubber band. (In order to work properly, the rubber band must be pre-stretched prior to class)