| Item | Location |
|---|---|
| Triple Point Apparatus | Room 71 |
| Liquid Nitrogen | Low Temperature Lab |
| Dewar | Set 11, Cabinet 2, Set 5 |
Set-up Notes:
Check periodically that there is enough vacuum grease on top of the copper cap - it will create a seal between the stopper and the hole
Maintenance Notes:
Check periodically that there is enough vacuum pump oil. While running, the window should show a level of at least half-full in order to run properly. Add more if this is not the case using a small beaker. The oil is stored near the switches.
