Equipment and Locations
Item(s) | Location |
---|---|
Bimetallic Stips | Set 11, Cabinet 1, Shelf 3 |
Bunsen Burner (optional) | Beneath prep bench |
Liquid Nitrogen (optional) | Low Temperature Lab |
Set-up Instructions
1. Collect liquid nitrogen from the Low Temperature lab a minimum of 30 minutes prior to the start of lecture.
2. When connecting the bunsen burner, be sure that the gas main is turned on at the wall and beneath the bench (key required). Test flame height prior to the start of lecture.
**No additional steps necessary to prepare demonstration for the professor.