Set-up Instructions for M: S - 8

Equipment and Locations

Item(s) Location
Set of 2 Disks (1 weighted) Set 9, Cabinet 1, Shelf 2
Ramp Set 5 - on top
Board for stopping motion Set 3 - on top
Door Stop (for angling ramp) Switch Station

Set-up Instructions

1. Clamp board to edge of demo bench using 2 C-clamps.

2. Place doorstop beneath edge of ramp farthest from board.  Place piece of foam between lower edge of ramp and the board.

3. Use index cards as shims to achieve a balanced roll down the board (due to uneveness of the floor)