| Item | Location |
|---|---|
| 2 Rollers - one smooth, one rough | Rod Station |
| Wavy Track | Set 7, Top of Cabinet |
| Yellow Foam |
Set-up Instructions:
1. Adjust the screws so that the smooth roller will just barely make it over the first hill when released from rest - build some suspense and provide some intrigue to those watching.
2. Place yellow foam at the end of track to catch the roller that lands and stops.
**Double check once this has been rolled into the lecture hall! Due to differences in floor evenness, proper leveling in the prep area does not guarantee proper leveling in lecture hall**