Set-up Instructions for E&M: M - 2

Equipment Locations
Item Location
Large Solenoid Set 4, Cabinet 1, Shelf 2
Iron Core
Box of Nails
Collecting Pan
Rheostat Beneath Demo Bench
DC Swith Switch Station

Set-up Instructions

1. Connect solenoid in series with a 8.5-A rheostat and DC switch.

2. Place collecting pan against solenoid base with box of nails on pan.

3. Insert ion core into solenoid.