Set-up Instructions for E&M: M - 1

Equipment Locations
Item(s) Location
Strong Magnetron Magnet Set 4, Cabinet 1, Shelf 4
Jumping Wire Set 2 - Front of end cap
DC Switch Switch station
Rheostat Demo Bench
Special Ring Standx2 Behind Toepler Device
Compass Needle Set 4, Cabinet 1, Shelf 3

Set-up Instructions

1. Clamp DC switch to bench and plug in.

(Be sure to turn on the DC - master switch located in prep room)

2. Drape wire between the two ring stands.

3. Place compass beneath wire.

4. Connect wire in series with the DC switch an the 18A rheostat.