Set-up Instructions for E&M: C - 1

Equipment Locations
Item Location
Cu/NiCr Wire Apparatus Set 4, Cabinet 3, Shelf 3
Bench w/ Rheostat Prep Area
3 Wires (1 very long) Wire Wall
Multimeter (optional)  
Scraps of Paper (optional)  

Set-up Instructions: 

1. Wire the apparatus in series with a DC switch and an 18A rheostat